Quality control
Every lamp is tested before it is boxed
We are ISO 9001:2015 certified. Each product goes through four checks: incoming materials, in-process, 100% electrical testing and final inspection before loading. Third-party inspection by SGS, BV or your own QC team is welcome.
- Incoming: glass, metal parts and cables checked against the approved sample
- In-process: finish thickness and color checked on every batch
- Electrical: 100% hi-pot and earth continuity test
- Final: AQL 2.5 inspection, photos sent before loading

Testing
Tests we run
| Test | Standard / method | How often |
|---|---|---|
| Hi-pot (dielectric strength) | EN 60598-1 | Every lamp |
| Earth continuity | EN 60598-1 | Every Class I lamp |
| Burn-in | 4 hours at rated voltage | Every lamp |
| Salt spray | 48 hours, ISO 9227 | Each new finish |
| Carton drop test | ISTA 1A | Each new carton design |
By market
Certificates
| Market | Certificates available |
|---|---|
| European Union | CE (LVD, EMC), RoHS, ErP |
| United Kingdom | UKCA |
| United States & Canada | ETL or UL on request |
| Australia & New Zealand | SAA / RCM on request |

Send us your product list. We quote within 24 hours.
Photos, drawings or a link to a product you sell today are all fine. Tell us the quantity and the country it ships to.
